A natural gas operator in the Kingdom of Saudi Arabia (Jafurah Field) enlisted Workover Solutions (WOS) to provide thru-tubing Bottom Hole Assembly (BHA) components and tool specialists for their stickpipe-conveyed frac plug drillout operations. As with any job, it came with a set of challenges, something welcomed by the WOS team, thanks to its high-level expertise in downhole long lateral drillouts.
A long lateral, high True Vertical Depth (TVD) (10,144’), high pressure (5,600psi), sour gas (CO2, H2S), potential high friction through curve and lateral and a harsh environment set up quite the test for our tools.
WOS started with planning and communication, connecting all service companies enlisted for the job with the operator. Utilizing pre-well Torque and Drag modeling, we increased our operational confidence.
Each BHA component was manufactured in-house at WOS out of Inconel alloy, a family of nickel-chromium-based superalloys known for exceptional corrosion resistance, high-temperature strength and structural stability.
The WOS tools for the job were the Terminator T1000 Metal to Metal motor, equipped to handle the high H2S and CO2 environment. The T1000 is not limited by temperature, chemicals or corrosive environments. Without elastomers in the motor, the risk of stator chunking and elastomeric damage was eliminated. In addition, the POWR motor offers high torque generation.
All of the dissolvable frac plugs (84) were drilled out to Total Depth (TD) at 25,840’ with one BHA. This was accomplished within the operator’s target time frame and included no Health, Safety or Environment (HSE) incidents. It was the longest lateral completed in the region (15,612’).
WOS is proud of every record setting achievement and grateful our customers can rely on our knowledge, tools and ability to get the job done.
If you want to get the conversation started with our team, reach out anytime via email at sales@wos.com or give us a call at 346-774-4433.

